This project will reconstruct Washington Blvd into a concrete 5-lane roadway with 5-foot wide sidewalks on both sides of the street. This project also includes the replacement of water and sewer lines on Washington Blvd and repair work to water and sewer lines on Sabine Pass, from Washington Blvd to the water tower on Harriot St.

PROJECT: Washington Blvd – Phase I (MLK Parkway to Amarillo)
CONTRACTOR: Brystar
EST. COST: $16.45MM
EST. COMPLETION DATE: May 2017. Construction is approximately 78% complete.